Floodline Determination Study
1:50 and 1:100 year floodline modelling and report for municipal, environmental or bank submission.
- Typical cost: R18 000 to R95 000
- Turnaround: 3 to 8 weeks
Delivered by: Water and Sanitation, Stormwater and Drainage
Site drainage, attenuation, erosion control and municipal stormwater connection approval.
Cost bands and turnaround times are indicative. The binding figure is the written quotation you accept. Read the disclaimer
Professionals registered in these disciplines carry out this work. Open the directory to see who is listed in your province.
Stormwater and Drainage
Engineering
Civil Engineering
Engineering
How your request is handled
MyEngineer brokers the appointment: we scope it, match it, set the milestones and see it through. Our fee is 10% of the professional's fee, including VAT, carried on the professional's side.
Studies and investigations
Other pre-listed services, each with its own cost band and turnaround.
1:50 and 1:100 year floodline modelling and report for municipal, environmental or bank submission.
Delivered by: Water and Sanitation, Stormwater and Drainage
Test pits, soil classification, founding recommendations and NHBRC-compliant geotechnical reporting.
Delivered by: Geotechnical Engineering
Topographical survey, beacon relocation, contour mapping and drone-captured orthophotos and point clouds.
Delivered by: Land Survey and Mapping
Cracks, damp, leaks, tripping distribution boards, low water pressure or blocked drains. An engineer diagnoses the cause, not only the symptom.
Delivered by: Civil Engineering, Structural Engineering, Electrical Engineering, Plumbing
Independent review of water and electricity accounts, meter testing, leak detection and dispute support.
Delivered by: Water and Sanitation, Electrical Engineering
Describe the problem in your own words. The desk scopes it and routes it to a professional who has done this work before.